Type
Industry and Energy
Local
Portugal
State
Finished
Year
2015
Client
LUNDIN MINING (SOMINCOR)
- The project consisted in the construction of two ponds, with a capacity of 30,000 m3 and 45,000 m3, intended to receive water coming from the waste pond. This water is then sent to a lime reactor intended to reduce the pH level of the water used in the mining process. In fact, it was a project for impoundment and treatment of the water used in the mining process.
- Coordination, management and development of all project phases from design to execution, in particular: Structures, geotechnics, mechanics, hydraulics, electrical installations and safety.